Solar, Deer Island Admininstration/Warehouse Building - A 180-kW roof-mounted solar photovoltaic system was installed on the Administration/Warehouse roof in fall 2009. This $1.2 million design/build project was partially funded through ARRA and provides an annual savings in electrical costs of $19,000. |