About this Project:

MWRA’s Commonwealth Avenue Pumping Station supplies water to 85% of the City of Newton on a regular basis and can serve the remaining 15 percent in an emergency. The pumping station is supplied through a single connection to MWRA’s High Service City Tunnel. This project will provide a new connection to the station from two low service pipelines in Commonwealth Avenue and add low service pumps so that the City of Newton will continue to be supplied in the event of a City Tunnel failure.

This $6.8 million contract was awarded to WES Construction Corp. of Halifax, MA in January 2019 and is expected to be completed in about 18 months.

The Commonwealth Avenue Pumping Station was originally placed into service in 1953 and has received a variety of improvements over the years, including a renovation completed in 1999. That renovation upgraded the capacity and reliability of the pumping station and included the construction of a new ‘West’ Building to contain two additional pumps and a 900kW diesel-generator, and rehabilitation of the existing ‘East’ Building with new piping, valves and two pumps.

This project is one of the Metropolitan Redundancy Interim Improvements projects that are being implemented to improve emergency response to an unexpected shut down of the Metropolitan Tunnel system until a new redundant tunnel is constructed. The Commonwealth Avenue Pumping Station Improvements contract will provide a redundant potable water supply and other improvements to the pump station in the event that the City Tunnel needs to be taken out of service in an emergency.

Project Updates

April 27, 2021

Construction Update:

Close-out Activities

  • Completion of HVAC work
  • Paving Carriage Lane and PS driveways
  • Restoration - loam and seed median and PS site
  • Vendor and Consultant (B&V) Training
  • B&V - Record Drawings
  • B&V - Turnover package, facility handbook, SCADA handbook

3D Laser Scanning of the Pump Station

Wiring of New Duct Smoke Detectors

Monitoring FACP during wiring of duct detectors west pump station

New temperature control panel installed in West Pump Station

Interior new temperature control panel in East Pump Station

March 31, 2021

Construction Update:

Close-out Activities

  • 30 day acceptance test of West Pump Station
  • Completion of HVAC Work
  • Vendor and Consultant (B&V) Training
  • B&V - Record Drawings
  • B&V - Turnover Package, Facility Handbook, SCADA Handbook

Current status of the median area

Power washed exterior stonework at East pump station

Disconnecting wiring in existing temperature control panel

New main control panel in West pump station

March 2, 2021

Construction Update:

Restoring fencing around the East Pump Station

Wiring the new Control Cabinet in the West Pump Station

Before - Painting the West Pump Station Discharge Piping

After - Painting the West Pump Station Discharge Piping

Before - Painting the West Pump Station Room Piping

After - Painting the West Pump Station Room Piping

February 2, 2021

Construction Update:

Clean up on Harvard Street

Median Pending Restoration

Temporary Pavement Around Vault B/East Pump

New Windows Rear of East Pump

Tagging wires in the existing West Pump Station MCP

New West Pump Station MCP

December 14, 2020

Construction Update:

Installed WASM2 60" x 24" Tee

Installing 24" Piping Connecting WASM2 to Section 113

Installing 60" Cap on WASM2 for Pressure Testing New Piping

Installing Manual Air Release Valve on Section 113 in Median

October 29, 2020

Construction Update:

Shaft 6 Tie-in Thrust Block Reinforcement

Vaacum Excavating Around WASM2 in the Carriage Lane

Excavation and Trench Support Around 60" WASM2

Vacuum Excavating Around Section 113 in the Commonwealth Avenue Median

Excavation and Trench Support around 60" WASM2

New Pumps P-4 and P-5 in the East Pump Station

October 2, 2020

Construction Update:

Removal of Soil Stockpile at Cemetery

New Dehumidifier - East PS

60-inch EBAA Megalugs for WASM2 Work

Delivery of 60-inch Pipe Materials for WASM2 Work

Cutting Suction Main to East PS for Shaft 6 Tie-in

Carriage Lane Driveways at 1159 and 1169 Commonwealth Avenue

June 16, 2020

Construction Update:

Placing Lower Insertion Valve Body Sections on Water Mains

Placing Milling Head on Valve Body

Milling Valve Disc Slot in Water Main

Spreading Loam in Commonwealth Avenue Median

Temporary Paving Carriage Lane

Assembling Dehumidification Unit in the East PS Basement

April 27, 2020

Construction Update:

Replacing Control Spring on Existing Surge Valve in East Pump Station

Assembling New Piping on Discharge Header in East Pump Station

Modifications to AFDs in the East Pump Station

Forming Thrust Collar at Insertion Valve Excavation

June 28, 2019

Construction Update

Beginning next week, the MWRA’s contractor, WES Construction Corp., will start their mobilization efforts on the Commonwealth Avenue Carriage Lane in connection with a project to make improvements to the Commonwealth Avenue Pumping Station. This work includes placement of signage, temporary road barriers, temporary fencing, survey markings within the street, and the placement of equipment in preparation for roadway excavation. Work will take place Monday through Friday, 7AM-4PM.

The following week, beginning on Tuesday, July 9th, the contractor will dig test pits within the Carriage Lane of Commonwealth Avenue.  Test pits are smaller excavations to determine the exact location of existing infrastructure and allow for measurements of the pipe. This will take approximately two weeks to complete.

As mentioned previously, the MWRA and our contractor met with officials from the City of Newton, including the Police Department and determined that the Carriage Lane will be closed between Valentine Street and Wauwinet Road while test pits are excavated to ensure the public’s safety and to expedite the work.

During this phase of work, the Newton Police Department will allow residents who live in the area to travel in either direction on the Carriage Lane in order access their homes. Water service to your home will not be interrupted.

MWRA and our contractor appreciate your cooperation during this important water improvement project.

If you have any questions or concerns, please contact MWRA Community Coordinator, Jeffrey McLaughlin at (617) 305-5762 or jeffrey.mclaughlin@mwra.com.

Sign up for electronic project notifications and updates through our Everbridge service.

June 10, 2019

Construction Update

Massachusetts Water Resources Authority (MWRA) recently awarded the rehabilitation of the Commonwealth Avenue Water Pumping Station contract to WES Construction Corporation (WES).   The work involves the installation of new pipe to existing MWRA water mains.  The entire project will take 18 months to complete. Approximately 50% of the work will occur inside the pumping station.

Within the next week or so, MWRA’s contractor, WES, will perform test pits within the carriage lane of Commonwealth Avenue.  Test pits are smaller excavations to determine the exact location of existing infrastructure and allow for measurements of the pipe. This will take approximately two weeks.

This week the MWRA and our contractor met with officials from the City of Newton, including the police department.  For the public’s safety and the expedition of this work, the Carriage Lane will be closed between Valentine Street and Wauwinet Road while test pits are excavated.

During this work, the Newton Police Department will allow residents who live in the area to travel in either direction on the Carriage Lane in order access their homes.

Water service to your home will not be interrupted.

The MWRA and our contractor appreciate your cooperation during this important water improvement project.

If you have any questions or concerns, please contact MWRA Community Coordinator, Jeffrey McLaughlin at (617) 305-5762 or jeffrey.mclaughlin@mwra.com.

Sign up for electronic project notifications and updates through our Everbridge service.

April 1, 2019

Construction Update

Contruction updates will be posted here.

Sign up for electronic project notifications and updates through our Everbridge service.

 

Follow us
twitter icon
flickr
YouTube button

Back to top

Updated: April 27, 2021
Original Post: April 1, 2019